Years of service
The overall layout of the mine consists of a mining site, a waste dump, a beneficiation plant, a tailings pond, and mining roads, covering a total area of 243.18 hectares. The total service life of the mine is 33 years (including 1 year of infrastructure construction period), and the mining method is open-pit mining. The production scale includes 800000 tons/year of ore and 50000 tons/year of graphite powder.